Certification
Some conditions require certification that works have been carried out as required by the planning permit.
For example, an engineer may be required to certify that a particularly steep driveway has been constructed as required by the plans and drawings that were approved by the City of Hobart. This may mean that the engineer will need to supervise some of the works or to carry out inspections at certain points. We recommend that you discuss this with your engineer before the works commence.
To provide certification, we recommend that you ask your consultant to complete the certification at the following link.
Engineering Certificate(DOCX, 29KB)